Repository logo
 

Asset management optimization through integrated systems thinking and N-1 contingency capability for refurbishment.

dc.contributor.authorIjumba, Nelson Mutatina.
dc.contributor.authorWhitehead, Howard.
dc.contributor.authorMkandawire, Burnet O'Brien.
dc.date.accessioned2013-07-09T09:02:46Z
dc.date.available2013-07-09T09:02:46Z
dc.date.created2011-09
dc.date.issued2011-09
dc.description.abstractThis paper presents a systems view of refurbishment systems to evaluate root causes of suboptimal refurbishment. Case studies from ten selected South African and Malawian firms from largest electric power utilities, mining, petrochemical, and processing industries were used to establish causal relationships. Sample surveys of thirty four Malawian firms were used as part of a multimethod or triangulation approach to provide generalizations, validation and reliability. Of the surveyed firms, 66.7%, and of case studied firms 100%, showed that deferred refurbishment was a result of constrained capacity which led to components operating at higher loads, to lack of maintenance windows and to increased failure rates; there was no formal refurbishment model and technical skills base was the weakest asset management link. The study advances a novel way of depicting root causes of suboptimal refurbishment in typically complex dynamic structures using integrated systems thinking approach and applies analytical optimization tools, namely: Linear Programming (LP), metrics and N-1 contingency capability for refurbishment model for drilling deeper into causal typologies portrayed by systems thinking in order to solve optimization problems. A Total Refur-bishment Process model is advanced to replicate refurbishment decision structures for long term sustainability of industries as validated by industries studied.en
dc.identifier.citationMkandawire, B.O., Ijumba, N.M. and Whitehead, H. 2011. Asset management optimization through integrated systems thinking and N-1 contingency capability for refurbishment. IEEE Systems Journal 5 (3) pp. 261-279.en
dc.identifier.issn1932-8184
dc.identifier.urihttp://dx.doi.org/10.1109/JSYST.2011.2148790en
dc.identifier.urihttp://hdl.handle.net/10413/9277
dc.language.isoenen
dc.publisherInstitute of Electrical and Electronics Engineers.en
dc.subjectMaterials management--South Africa.en
dc.subjectMaterials management--Malawi.en
dc.subjectMachine tools--Maintenance and repair--South Africa.en
dc.subjectMachine tools--Maintenance and repair--Malawi.en
dc.subject.otherIntegrated systems thinking.en
dc.subject.otherAsset management tools.en
dc.subject.otherRefurbishment systems.en
dc.titleAsset management optimization through integrated systems thinking and N-1 contingency capability for refurbishment.en
dc.typePeer reviewed journal articleen

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Mkandawire_BO_September_2011.pdf
Size:
1.83 MB
Format:
Adobe Portable Document Format
Description:
Journal Article
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.64 KB
Format:
Item-specific license agreed upon to submission
Description: